Golden Bay Affordable Housing Project

mid build of GBMHAP
2021 03 16 v2. 3344. GBAHP TUI Collingwood. Architects Plans

Project Background

The community in Golden Bay has a solution for the dire shortage of affordable housing available for rent or purchase in the area. Up to 30 new 60sqm homes will be placed on council-owned or private land (several residents in the Golden Bay area have made land available)

Christopher Bennett, the developer of the project, has worked with Mark Goodison from Goodison Architecture to design transportable homes built from Formance SIPs.

2021 03 16. 3344. GBAHP TUI Collingwood. Architects Plans inside 1 square

A functional and comfortable design

The home design is simple, stylish & affordable, note the nice high ceilings, easily achieved with Formance SIPs. Formance SIPs (115mm thickness walls and 215mm thickness roof panels) were chosen in this design for energy efficiency, airtightness, improved moisture control, and speed-up build times.

A high-performance building envelope was very important in the project to ensure the homes were warm and dry and had low heating costs for the tenants. By using SIPs, around 50% reduction in heating costs can be achieved. 

SIP panels for the first four houses of this project have left the Formance factory, and are in the build process.

Tui

Chris Bennett and his team say the homes take around a total of 6 weeks to complete - but the more they become use to working with the products and the design they hope construction time will half to 3 weeks. 

Tui from corner
perspective cropped

Material costs reduced where possible - Paint can be directly applied to Formance SIPs and reduce the need for GIB/Plasterboard lining. Painting direct to the OSB gives also can be a desired design element. 